{"id":5320,"date":"2025-09-25T18:32:00","date_gmt":"2025-09-25T18:32:00","guid":{"rendered":"https:\/\/recalglobal.com\/?p=5320"},"modified":"2025-12-09T18:11:22","modified_gmt":"2025-12-09T18:11:22","slug":"lean-construction-efficiency-in-construction-projects","status":"publish","type":"post","link":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/","title":{"rendered":"Lean Construction: efficiency in construction projects"},"content":{"rendered":"\n<p>In construction, the most common challenges tend to repeat themselves: schedule delays, unforeseen cost overruns, rework that extends the project, and material waste. These issues not only affect a project\u2019s profitability, but also the client\u2019s trust. In this context, Lean Construction emerges as a philosophy that brings a profound change in the way projects are planned, executed, and delivered.<\/p>\n\n<p>Its purpose is clear: to maximize value for the client and minimize activities that do not contribute to results.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/Audi-Construccion-1024x683.png\" alt=\"\" class=\"wp-image-5337\" srcset=\"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/Audi-Construccion-1024x683.png 1024w, https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/Audi-Construccion-760x507.png 760w, https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/Audi-Construccion-768x512.png 768w, https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/Audi-Construccion-1536x1024.png 1536w, https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/Audi-Construccion-1568x1045.png 1568w, https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/Audi-Construccion.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<br>\n<h2> What is Lean Construction? <\/h2>\n<p>Lean Construction adapts the Lean philosophy \u2014born from the Toyota Production System and systematized by MIT researchers\u2014 to the construction sector. While in the automotive industry the goal was to eliminate unnecessary inventories and improve productivity, in construction this approach aims to deliver projects that are more agile, sustainable, and reliable.\n<\/p>\n<p>In a traditionally fragmented sector, Lean promotes integration: multidisciplinary teams working toward common goals, breaking down barriers and improving communication.\n <\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"545\" height=\"163\" src=\"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/11\/Lean-Construction-1.2-ingles.png\" alt=\"\" class=\"wp-image-5321\"\/><\/figure>\n\n\n\n<h2>Fundamental principles of Lean Construction<\/h2>\n\n<ul>\n<li><b>1. Identify Value<\/b>\n<p>Everything starts with the voice of the client. Understanding their expectations and translating them into clear goals is the first step in designing a truly efficient project. At this stage, the client provides us with the project\u2019s technical specifications (welding type, steel and sections, coatings, shipping), and with that information we define the design objectives and manufacturing procedures.\n<\/p>\n<\/li><br>\n<li><b>2. Map the value stream<\/b>\n<p>All project activities are analyzed, from design through delivery, to distinguish which generate value and which represent waste. Based on the project specifications, the manufacturing procedure for the structure is defined and an assembly work instruction is prepared for each piece, in compliance with the applicable standards and codes. For example, for a galvanized main girder, every activity\u2014material reception, fit-up, welding, inspection, and finishing\u2014is described step by step to identify what adds value for the client and what can be optimized.\n<\/p>\n<\/li><br>\n<li><b>3. Create flow<\/b>\n<p>Eliminating interruptions, bottlenecks, and idle time allows processes to move forward without unnecessary stops. Our manufacturing procedures allow us to adapt the workflow to the level of complexity of each element, avoiding rework and idle time.\n<\/p>\n<\/li><br>\n<li><b>4. Establish Pull System<\/b>\n<p>Unlike the traditional Push model (which produces in excess in anticipation of demand), the Pull system triggers each task or delivery only when it is truly needed. Each project and each element is unique. That is why we operate under a pull system: once a project is activated, we manage resources, design the manufacturing processes, and execute the production schedule according to the pieces required. This prevents build-ups, excess inventory, and cost overruns.\n<\/p>\n<\/li><br>\n<li><b>5. Pursue perfection<\/b>\n<p>Drawing on our experience, we capture lessons learned and improvement opportunities, design training plans to address those challenges, and standardize processes supported by performance indicators, moving toward projects that are increasingly efficient, safe, and high quality.\n<\/p>\n<\/li><br>\n<li><b>6. Transparency<\/b>\n<p>Information flows openly among everyone involved. This transparency fosters trust, early problem detection, and agile decision-making.\n<\/p>\n<\/li><br>\n<li><b>7. Capability Building<\/b>\n<p>Lean Construction requires every person to have the knowledge and the authority to identify problems and propose improvements. Human talent becomes a key driver of innovation and productivity.\n<\/p>\n<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/11\/DJI_20250530115716_0008_D-Edit-1024x576.jpg\" alt=\"\" class=\"wp-image-5308\" srcset=\"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/11\/DJI_20250530115716_0008_D-Edit-1024x576.jpg 1024w, https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/11\/DJI_20250530115716_0008_D-Edit-760x428.jpg 760w, https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/11\/DJI_20250530115716_0008_D-Edit-768x432.jpg 768w, https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/11\/DJI_20250530115716_0008_D-Edit-1536x864.jpg 1536w, https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/11\/DJI_20250530115716_0008_D-Edit-1568x882.jpg 1568w, https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/11\/DJI_20250530115716_0008_D-Edit.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2>Technical and strategic benefits of Lean Construction<\/h2>\n<p>Implementing this philosophy delivers measurable results in construction:<\/p>\n<ul><br>\n<li><b>\u2022 On-time delivery<\/b>\n<p>Collaborative planning reduces delays and bottlenecks, leading to more reliable handovers.\n<\/p>\n<\/li><br>\n<li><b>\u2022 Cost savings<\/b>\n<p>More efficient management of materials and labor can represent savings of up to 10% of the project budget.\n<\/p>\n<\/li><br>\n<li><b>\u2022 Increased productivity<\/b>\n<p>Eliminating idle time and rework can boost efficiency by as much as 30%.\n<\/p>\n<\/li><br>\n<li><b>\u2022 Improved quality<\/b>\n<p>Lean drives processes that aim to prevent errors from the start, reducing rework and raising construction standards.\n<\/p>\n<\/li><br>\n<li><b>\u2022 Risk management<\/b>\n<p>By identifying hazards and constraints from the design stage, it reduces improvisation and the likelihood of incidents on site.\n<\/p>\n<\/li>\n<br>\n<li><b>\u2022 Team cohesion<\/b>\n<p>By actively involving all parties, it strengthens motivation and alignment around shared goals.\n<\/p>\n<\/li>\n<br>\n<li><b>\u2022 Data-driven decisions<\/b>\n<p>Recording and analyzing reliable indicators facilitates continuous improvement and enables precise adjustments in the production process.\n<\/p>\n<\/li>\n<br>\n<li><b>\u2022 Waste reduction<\/b>\n<p>Lean categorizes the typical types of waste in construction: overproduction, waiting time, unnecessary transportation, rework, excessive inventories, non-value-adding motions, defects, and the waste of not leveraging people\u2019s knowledge.\n<\/p>\n<\/li>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"584\" height=\"123\" src=\"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/11\/Lean-Construction-04-ingles.png\" alt=\"\" class=\"wp-image-5323\"\/><\/figure>\n\n\n\n<h2>The contrast between Push and Pull models<\/h2>\n<p>In the traditional Push model, tasks are planned in sequence and \u201cpushed\u201d to the jobsite, generating material build-ups and a lower ability to adapt to change. In contrast, the Pull model starts from the end goals and activates each phase only when it is required.\n<\/p>\n<br>\n<p>This shift not only avoids unnecessary inventories, but also increases the project\u2019s flexibility, makes it easier to adapt to design changes, and improves quality by focusing on critical, well-coordinated tasks.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"612\" height=\"296\" src=\"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/11\/Lean-Construction-03-ingles.png\" alt=\"\" class=\"wp-image-5325\"\/><\/figure>\n\n\n\n<h2>Beyond projects: a culture of continuous improvement<\/h2>\n<p>Lean Construction is not limited to optimizing a schedule. When it is implemented, the company develops an organizational culture based on continuous improvement, transparency, and respect for people.<\/p>\n<ul>This translates into:\n<li>\u2022 Safer, more productive workplaces.<\/li>\n<li>\u2022 Greater client trust by delivering what they really need, on time and with quality.<\/li>\n<li>\u2022 A sustainable competitive advantage, by consolidating processes that set the company apart in the market.<\/li><\/ul>\n<br>\n<h2>Our vision at Recal<\/h2>\n<p>At our company, Lean Construction is not a theoretical concept: it is the foundation of how we conceive and execute every project. From the fabrication of steel components to erection and coating, we apply this philosophy to ensure deadlines are met, costs are controlled, and quality standards remain high.<\/p>\n<ul>Lean allows us to:\n<li>\u2022 Turn planning into reliable outcomes.<\/li>\n<li>\u2022 Optimize every resource, from materials to specialized labor.<\/li>\n<li>\u2022 Enhance safety at every stage of the project.<\/li>\n<li>\u2022 Ensure that every structure reflects innovation, discipline, and lasting value.<\/li>\n<br>\n<h2>Conclusion<\/h2>\n<p>Lean Construction is redefining the way we build around the world. It is more than efficiency: it is a forward-looking vision that puts the client at the center and turns every project into an opportunity to build trust and excellence.<\/p>\n<br>\n<p>At Recal, we already work under this approach, convinced that the future is not something you wait for: it is built day by day with vision, commitment, and continuous improvement.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In construction, the most common challenges tend to repeat themselves: schedule delays, unforeseen cost overruns, rework that extends the project, and material waste. These issues not only affect a project\u2019s profitability, but also the client\u2019s trust. In this context, Lean Construction emerges as a philosophy that brings a profound change in the way projects are&hellip; <a class=\"more-link\" href=\"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/\">Continue reading <span class=\"screen-reader-text\">Lean Construction: efficiency in construction projects<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":5330,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[12,1],"tags":[],"class_list":["post-5320","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-structures","category-uncategorized","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Lean Construction: efficiency in construction projects - Recal<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lean Construction: efficiency in construction projects - Recal\" \/>\n<meta property=\"og:description\" content=\"In construction, the most common challenges tend to repeat themselves: schedule delays, unforeseen cost overruns, rework that extends the project, and material waste. These issues not only affect a project\u2019s profitability, but also the client\u2019s trust. In this context, Lean Construction emerges as a philosophy that brings a profound change in the way projects are&hellip; Continue reading Lean Construction: efficiency in construction projects\" \/>\n<meta property=\"og:url\" content=\"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"Recal\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-25T18:32:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-09T18:11:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/DJI_0006-5-cuadro.png\" \/>\n\t<meta property=\"og:image:width\" content=\"766\" \/>\n\t<meta property=\"og:image:height\" content=\"766\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"webrecal6190\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"webrecal6190\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/lean-construction-efficiency-in-construction-projects\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/lean-construction-efficiency-in-construction-projects\\\/\"},\"author\":{\"name\":\"webrecal6190\",\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/#\\\/schema\\\/person\\\/1d93ba0b100ba2a52ea1e045e7da90c3\"},\"headline\":\"Lean Construction: efficiency in construction projects\",\"datePublished\":\"2025-09-25T18:32:00+00:00\",\"dateModified\":\"2025-12-09T18:11:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/lean-construction-efficiency-in-construction-projects\\\/\"},\"wordCount\":991,\"image\":{\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/lean-construction-efficiency-in-construction-projects\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/recalglobal.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/DJI_0006-5-cuadro.png\",\"articleSection\":[\"Structures\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/lean-construction-efficiency-in-construction-projects\\\/\",\"url\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/lean-construction-efficiency-in-construction-projects\\\/\",\"name\":\"Lean Construction: efficiency in construction projects - Recal\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/lean-construction-efficiency-in-construction-projects\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/lean-construction-efficiency-in-construction-projects\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/recalglobal.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/DJI_0006-5-cuadro.png\",\"datePublished\":\"2025-09-25T18:32:00+00:00\",\"dateModified\":\"2025-12-09T18:11:22+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/#\\\/schema\\\/person\\\/1d93ba0b100ba2a52ea1e045e7da90c3\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/lean-construction-efficiency-in-construction-projects\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/recalglobal.com\\\/en\\\/lean-construction-efficiency-in-construction-projects\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/lean-construction-efficiency-in-construction-projects\\\/#primaryimage\",\"url\":\"https:\\\/\\\/recalglobal.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/DJI_0006-5-cuadro.png\",\"contentUrl\":\"https:\\\/\\\/recalglobal.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/DJI_0006-5-cuadro.png\",\"width\":766,\"height\":766,\"caption\":\"Construcci\u00f3n de la planta GM ubicado en Ramos Arizpe: montaje de m\u00f3dulos de estructura.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/lean-construction-efficiency-in-construction-projects\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lean Construction: efficiency in construction projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/\",\"name\":\"Recal\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/#\\\/schema\\\/person\\\/1d93ba0b100ba2a52ea1e045e7da90c3\",\"name\":\"webrecal6190\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c4ed408d08ae5c58726b27a6bd74d24dbb3bf71ec3cf0e3d9ca71f7bae94584a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c4ed408d08ae5c58726b27a6bd74d24dbb3bf71ec3cf0e3d9ca71f7bae94584a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c4ed408d08ae5c58726b27a6bd74d24dbb3bf71ec3cf0e3d9ca71f7bae94584a?s=96&d=mm&r=g\",\"caption\":\"webrecal6190\"},\"sameAs\":[\"https:\\\/\\\/recalglobal.com\"],\"url\":\"https:\\\/\\\/recalglobal.com\\\/en\\\/author\\\/webrecal6190\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lean Construction: efficiency in construction projects - Recal","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/","og_locale":"en_US","og_type":"article","og_title":"Lean Construction: efficiency in construction projects - Recal","og_description":"In construction, the most common challenges tend to repeat themselves: schedule delays, unforeseen cost overruns, rework that extends the project, and material waste. These issues not only affect a project\u2019s profitability, but also the client\u2019s trust. In this context, Lean Construction emerges as a philosophy that brings a profound change in the way projects are&hellip; Continue reading Lean Construction: efficiency in construction projects","og_url":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/","og_site_name":"Recal","article_published_time":"2025-09-25T18:32:00+00:00","article_modified_time":"2025-12-09T18:11:22+00:00","og_image":[{"width":766,"height":766,"url":"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/DJI_0006-5-cuadro.png","type":"image\/png"}],"author":"webrecal6190","twitter_card":"summary_large_image","twitter_misc":{"Written by":"webrecal6190","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/#article","isPartOf":{"@id":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/"},"author":{"name":"webrecal6190","@id":"https:\/\/recalglobal.com\/en\/#\/schema\/person\/1d93ba0b100ba2a52ea1e045e7da90c3"},"headline":"Lean Construction: efficiency in construction projects","datePublished":"2025-09-25T18:32:00+00:00","dateModified":"2025-12-09T18:11:22+00:00","mainEntityOfPage":{"@id":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/"},"wordCount":991,"image":{"@id":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/DJI_0006-5-cuadro.png","articleSection":["Structures"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/","url":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/","name":"Lean Construction: efficiency in construction projects - Recal","isPartOf":{"@id":"https:\/\/recalglobal.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/#primaryimage"},"image":{"@id":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/DJI_0006-5-cuadro.png","datePublished":"2025-09-25T18:32:00+00:00","dateModified":"2025-12-09T18:11:22+00:00","author":{"@id":"https:\/\/recalglobal.com\/en\/#\/schema\/person\/1d93ba0b100ba2a52ea1e045e7da90c3"},"breadcrumb":{"@id":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/#primaryimage","url":"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/DJI_0006-5-cuadro.png","contentUrl":"https:\/\/recalglobal.com\/wp-content\/uploads\/2025\/09\/DJI_0006-5-cuadro.png","width":766,"height":766,"caption":"Construcci\u00f3n de la planta GM ubicado en Ramos Arizpe: montaje de m\u00f3dulos de estructura."},{"@type":"BreadcrumbList","@id":"https:\/\/recalglobal.com\/en\/lean-construction-efficiency-in-construction-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/recalglobal.com\/en\/"},{"@type":"ListItem","position":2,"name":"Lean Construction: efficiency in construction projects"}]},{"@type":"WebSite","@id":"https:\/\/recalglobal.com\/en\/#website","url":"https:\/\/recalglobal.com\/en\/","name":"Recal","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/recalglobal.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/recalglobal.com\/en\/#\/schema\/person\/1d93ba0b100ba2a52ea1e045e7da90c3","name":"webrecal6190","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c4ed408d08ae5c58726b27a6bd74d24dbb3bf71ec3cf0e3d9ca71f7bae94584a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c4ed408d08ae5c58726b27a6bd74d24dbb3bf71ec3cf0e3d9ca71f7bae94584a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c4ed408d08ae5c58726b27a6bd74d24dbb3bf71ec3cf0e3d9ca71f7bae94584a?s=96&d=mm&r=g","caption":"webrecal6190"},"sameAs":["https:\/\/recalglobal.com"],"url":"https:\/\/recalglobal.com\/en\/author\/webrecal6190\/"}]}},"_links":{"self":[{"href":"https:\/\/recalglobal.com\/en\/wp-json\/wp\/v2\/posts\/5320","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/recalglobal.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/recalglobal.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/recalglobal.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/recalglobal.com\/en\/wp-json\/wp\/v2\/comments?post=5320"}],"version-history":[{"count":3,"href":"https:\/\/recalglobal.com\/en\/wp-json\/wp\/v2\/posts\/5320\/revisions"}],"predecessor-version":[{"id":5340,"href":"https:\/\/recalglobal.com\/en\/wp-json\/wp\/v2\/posts\/5320\/revisions\/5340"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/recalglobal.com\/en\/wp-json\/wp\/v2\/media\/5330"}],"wp:attachment":[{"href":"https:\/\/recalglobal.com\/en\/wp-json\/wp\/v2\/media?parent=5320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/recalglobal.com\/en\/wp-json\/wp\/v2\/categories?post=5320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/recalglobal.com\/en\/wp-json\/wp\/v2\/tags?post=5320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}